GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 194.20-19: -19 Piping and electrical requirements.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER U—OCEANOGRAPHIC RESEARCH VESSELS
  4. PART 194—HANDLING, USE, AND CONTROL OF EXPLOSIVES AND OTHER HAZARDOUS MATERIALS
  5. Subpart 194.20—Chemical Stores and/or Storerooms

(a) Piping, electrical equipment, and wiring shall not be installed within or pass through a chemical storeroom except as required for the chemical storeroom itself.

(b) The electrical installation shall be in accordance with the applicable requirements of Subchapter J (Electrical Engineering) of this chapter for Class I, Division 1, Group C hazardous locations.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection