GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 32.53-30: -30 Positive pressure—T/ALL.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER D—TANK VESSELS
  4. PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS
  5. Subpart 32.53—Inert Gas System

Each inert gas system must be designed to enable the operator to maintain a gas pressure of 100 millimeters (4 inches) of water on filled cargo tanks and during loading and unloading of cargo tanks.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection