46 CFR 32.53-30: -30 Positive pressure—T/ALL.
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER D—TANK VESSELS
- PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS
- Subpart 32.53—Inert Gas System
Each inert gas system must be designed to enable the operator to maintain a gas pressure of 100 millimeters (4 inches) of water on filled cargo tanks and during loading and unloading of cargo tanks.
Collected 2026-08-27T02:26:22Z. Source file · JSON