46 CFR 42.25-20: -20 Computation for freeboard.
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER E—LOAD LINES
- PART 42—DOMESTIC AND FOREIGN VOYAGES BY SEA
- Subpart 42.25—Special Requirements for Vessels Assigned Timber Freeboards
(a) The minimum summer freeboards must be computed in accordance with §§ 42.20-5 (a) and (b), 42.20-13, 42.20-15, 42.20-20, 42.20-25, 42.20-30, 42.20-35, 42.20-60, and 42.20-65, except that § 42.20-60 is modified by substituting the percentages in table 42.25-20(a) for those given in § 42.20-60:
Table 42.25-20(a)—Percentage of Deduction for Superstructure
[Total Effective Length of Superstructure]
0 0.1L 0.2L 0.3L 0.4L 0.5L 0.6L 0.7L 0.8L 0.9L 1.0L
Percentage of deduction for all types of superstructure 1 20 31 42 53 64 70 76 82 88 94 100
1 Percentages at intermediate lengths of superstructures shall be obtained by linear interpolation.
(b) The winter timber freeboard shall be obtained by adding to the summer timber freeboard one thirty-sixth of the molded summer timber draft.
(c) The winter North Atlantic timber freeboard shall be the same as the winter North Atlantic freeboard prescribed in § 42.20-75(d)(1).
(d) The tropical timber freeboard shall be obtained by deducting from the summer timber freeboard one forty-eighth of the molded summer timber draft.
(e) The fresh water timber freeboard shall be computed in accordance with § 42.20-75(e) (1) or (2) based on the summer timber load waterline.
Collected 2026-08-27T02:26:22Z. Source file · JSON