46 CFR 50.20-15: -15 Previously approved plans.
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER F—MARINE ENGINEERING
- PART 50—GENERAL PROVISIONS
- Subpart 50.20—Plan Submittal and Approval
(a) A manufacturer wishing to fabricate equipment in accordance with a plan previously approved is not required to resubmit such plans provided:
(1) Certification is submitted that the proposed equipment conforms in every respect to the plan previously approved, and such certification contains the drawing number, title, date, and last revision or change date, and date of previous approval;
(2) The current regulations, including adopted specifications, standards or codes, pertaining to the proposed equipment are the same as those current when the original plan was approved; and
(3) A copy of the approved plan is available for review by the approving office.
(b) [Reserved]