GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 64.61: Rupture disc.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER F—MARINE ENGINEERING
  4. PART 64—MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS
  5. Subpart C—Pressure Relief Devices and Vacuum Relief Devices for MPTs

If a rupture disc is the only pressure relief device on the tank, the rupture disc must—

(a) Rupture at a pressure of 125 percent of the maximum allowable working pressure; and

(b) Have a minimum normal venting capacity that is sufficient to prevent the tank pressure from exceeding 137.5 percent of the maximum allowable working pressure.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection