48 CFR 1425.202: 1425.202 Exceptions.
Where this section sits in the code
- Title 48—Federal Acquisition Regulations System
- CHAPTER 14—DEPARTMENT OF THE INTERIOR
- SUBCHAPTER D—SOCIOECONOMIC PROGRAMS
- PART 1425—FOREIGN ACQUISITION
- Subpart 1425.2—Buy American Act—Construction Materials
(a)(1) The CO may determine the reasonableness of cost as determined by the formula in 1425.203-70.
(2) The Director, PAM has the authority to make the determination that use of U.S. construction material would be impracticable. Failure of the Director, PAM to issue a determination within 30 days after receipt of a request will be deemed approval for use of the cited foreign material.
(3) For items not on the list at FAR 25.108(d), the CCO may make the non-availability determination if the items cost less than the SAT. The HCA may make the non-availability determination when the cost of the items exceeds the SAT.
(b) [Reserved]
Collected 2026-08-27T02:26:29Z. Source file · JSON