48 CFR 1436.209: 1436.209 Construction contracts with architect-engineer firms.
Where this section sits in the code
- Title 48—Federal Acquisition Regulations System
- CHAPTER 14—DEPARTMENT OF THE INTERIOR
- SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING
- PART 1436—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS
- Subpart 1436.2—Special Aspects of Contracting for Construction
Approval to award a contract for construction to a firm or its subsidiaries that designed the project shall be made by the HCA only after discussion with Director, PAM, and with legal concurrence. The request for approval prepared by the CO shall include the reason(s) why award to the design firm is required; an analysis of the facts involving potential or actual organizational conflicts of interest, including benefits and detriments to the Government and the prospective contractor; and the measures which are to be taken to avoid, neutralize or mitigate conflicts of interest. A copy of the documentation shall be forwarded to PAM at the time of consultation.
Collected 2026-08-27T02:26:29Z. Source file · JSON