48 CFR 53.209-1: 53.209-1 Responsible prospective contractors.
Where this section sits in the code
- Title 48—Federal Acquisition Regulations System
- CHAPTER 1—FEDERAL ACQUISITION REGULATION
- SUBCHAPTER H—CLAUSES AND FORMS
- PART 53—FORMS
- Subpart 53.2—Prescription of Forms
The following forms are prescribed for use in conducting preaward surveys of prospective contractors, as specified in 9.106-1, 9.106-2, and 9.106-4. These forms are authorized for local reproduction and can be found at the GSA Forms Library at https://www.gsa.gov/forms.
(a) SF 1403 (Rev. 01/2014), Preaward Survey of Prospective Contractor (General).
(b) SF 1404 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Technical.
(c) SF 1405 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Production.
(d) SF 1406 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Quality Assurance.
(e) SF 1407 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Financial Capability.
(f) SF 1408 (Rev. 01/2014), Preaward Survey of Prospective Contractor—Accounting System.
Collected 2026-08-27T02:26:29Z. Source file · JSON