48 CFR 536.102: 536.102 Definitions.

Read at publisher ↗
Where this section sits in the code
  1. Title 48—Federal Acquisition Regulations System
  2. CHAPTER 5—GENERAL SERVICES ADMINISTRATION
  3. SUBCHAPTER F—SPECIAL CATEGORIES OF CONTRACTING
  4. PART 536—CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS
  5. Subpart 536.1—General

Construction-Manager-as-Constructor (CMc) means the project delivery method where design and construction are contracted concurrently through two separate contracts and two separate contractors. Unlike the traditional design-bid-build delivery method, under the CMc delivery method, the Government awards a separate contract to a designer (i.e., architect-engineer contractor) and to a construction contractor (i.e., CMc contractor) prior to the completion of the design documents. The Government retains the CMc contractor during design to work with the architect-engineer contractor to provide constructability reviews and cost estimating validation. The CMc contract includes design phase services at a firm-fixed-price and an option for construction at a guaranteed maximum price.

Collected 2026-08-27T02:26:29Z. Source file · JSON

Browse this collection