49 CFR 192.376: Installation of plastic service lines by trenchless excavation.
Where this section sits in the code
- Title 49—Transportation
- Subtitle B—Other Regulations Relating to Transportation
- CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
- SUBCHAPTER D—PIPELINE SAFETY
- PART 192—TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS
- Subpart H—Customer Meters, Service Regulators, and Service Lines
Plastic service lines installed by trenchless excavation must comply with the following:
(a) Each operator shall take practicable steps to provide sufficient clearance for installation and maintenance activities from other underground utilities and structures at the time of installation.
(b) For each pipeline section, plastic pipe and components that are pulled through the ground must use a weak link, as defined by § 192.3, to ensure the pipeline will not be damaged by any excessive forces during the pulling process.