GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

49 CFR 192.719: Transmission lines: Testing of repairs.

Read at publisher ↗
Where this section sits in the code
  1. Title 49—Transportation
  2. Subtitle B—Other Regulations Relating to Transportation
  3. CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
  4. SUBCHAPTER D—PIPELINE SAFETY
  5. PART 192—TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS
  6. Subpart M—Maintenance

(a) Testing of replacement pipe. If a segment of transmission line is repaired by cutting out the damaged portion of the pipe as a cylinder, the replacement pipe must be tested to the pressure required for a new line installed in the same location. This test may be made on the pipe before it is installed.

(b) Testing of repairs made by welding. Each repair made by welding in accordance with §§ 192.713, 192.715, and 192.717 must be examined in accordance with § 192.241.