49 CFR 194.115: Response resources.

Read at publisher ↗
Where this section sits in the code
  1. Title 49—Transportation
  2. Subtitle B—Other Regulations Relating to Transportation
  3. CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
  4. SUBCHAPTER D—PIPELINE SAFETY
  5. PART 194—RESPONSE PLANS FOR ONSHORE OIL PIPELINES
  6. Subpart B—Response Plans

(a) Each operator shall identify and ensure, by contract or other approved means, the resources necessary to remove, to the maximum extent practicable, a worst case discharge and to mitigate or prevent a substantial threat of a worst case discharge.

(b) An operator shall identify in the response plan the response resources which are available to respond within the time specified, after discovery of a worst case discharge, or to mitigate the substantial threat of such a discharge, as follows:

Tier 1 Tier 2 Tier 3

High volume area 6 hrs 30 hrs 54 hrs.

All other areas 12 hrs 36 hrs 60 hrs.