49 CFR 195.304: Test pressure.
Where this section sits in the code
- Title 49—Transportation
- Subtitle B—Other Regulations Relating to Transportation
- CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
- SUBCHAPTER D—PIPELINE SAFETY
- PART 195—TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE
- Subpart E—Pressure Testing
The test pressure for each pressure test conducted under this subpart must be maintained throughout the part of the system being tested for at least 4 continuous hours at a pressure equal to 125 percent, or more, of the maximum operating pressure and, in the case of a pipeline that is not visually inspected for leakage during the test, for at least an additional 4 continuous hours at a pressure equal to 110 percent, or more, of the maximum operating pressure.
Collected 2026-08-27T02:26:34Z. Source file · JSON