49 CFR 196.103: What must an excavator do to protect underground pipelines from excavation-related damage?
Where this section sits in the code
- Title 49—Transportation
- Subtitle B—Other Regulations Relating to Transportation
- CHAPTER I—PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
- SUBCHAPTER D—PIPELINE SAFETY
- PART 196—PROTECTION OF UNDERGROUND PIPELINES FROM EXCAVATION ACTIVITY
- Subpart B—Damage Prevention Requirements
Prior to and during excavation activity, the excavator must:
(a) Use an available one-call system before excavating to notify operators of underground pipeline facilities of the timing and location of the intended excavation;
(b) If underground pipelines exist in the area, wait for the pipeline operator to arrive at the excavation site and establish and mark the location of its underground pipeline facilities before excavating;
(c) Excavate with proper regard for the marked location of pipelines an operator has established by taking all practicable steps to prevent excavation damage to the pipeline;
(d) Make additional use of one-call as necessary to obtain locating and marking before excavating to ensure that underground pipelines are not damaged by excavation.
Collected 2026-08-27T02:26:34Z. Source file · JSON