49 CFR 230.19: Posting of FRA Form No. 1 and FRA Form No. 3.
Where this section sits in the code
- Title 49—Transportation
- Subtitle B—Other Regulations Relating to Transportation
- CHAPTER II—FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
- PART 230—STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS
- Subpart A—General
(a) FRA Form No. 1. The steam locomotive owner and/or operator shall place a copy of the 31 and 92 service day inspection report (FRA Form No. 1), properly filled out, under transparent cover in a conspicuous place in the cab of the steam locomotive before the inspected boiler is put into service. This FRA Form No. 1 will not be required for the first 31 service days following an annual inspection and the posting of an FRA Form No. 3. (See appendix B of this part.)
(b) FRA Form No. 3. In addition to the FRA Form No. 1, the steam locomotive owner and/or operator shall also maintain in the cab a current copy of FRA Form No. 3 in the manner described in paragraph (a) of this section. (See appendix C of this part.)
Collected 2026-08-27T02:26:34Z. Source file · JSON