GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

7 CFR 1724.40: General.

Read at publisher ↗
Where this section sits in the code
  1. Title 7—Agriculture
  2. Subtitle B—Regulations of the Department of Agriculture
  3. CHAPTER XVII—RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE
  4. PART 1724—ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES
  5. Subpart D—Electric System Planning

Borrowers shall have ongoing, integrated planning to determine their short-term and long-term needs for plant additions, improvements, replacements, and retirements for their electric systems. The primary components of the planning system consist of long-range engineering plans and construction work plans. Long-range engineering plans identify plant investments required over a long-range period, 10 years or more. Construction work plans specify and document plant requirements for a shorter term, 2 to 4 years. Long-range engineering plans and construction work plans shall be in accordance with part 1710, subpart F, of this chapter. See also RUS Bulletins 1724D-101A, Electric System Long-Range Planning Guide, and 1724D-101B, System Planning Guide, Construction Work Plans, for additional guidance. These bulletins are available at https://www.rd.usda.gov/resources/regulations/bulletins.

Collected 2026-08-27T02:24:01Z. Source file · JSON

Browse this collection