Browse Federal regulations
Read the original sections, or search by topic.
- 30 CFR 250.842 · Approval of safety systems design and installation features.
- 30 CFR 250.843-250.849 · §§ 250.843-250.849 [Reserved]
- 30 CFR 250.850 · Production system requirements—general.
- 30 CFR 250.851 · Pressure vessels (including heat exchangers) and fired vessels.
- 30 CFR 250.852 · Flowlines/Headers.
- 30 CFR 250.853 · Safety sensors.
- 30 CFR 250.854 · Floating production units equipped with turrets and turret-mounted systems.
- 30 CFR 250.855 · Emergency shutdown (ESD) system.
- 30 CFR 250.856 · Engines.
- 30 CFR 250.857 · Glycol dehydration units.
- 30 CFR 250.858 · Gas compressors.
- 30 CFR 250.859 · Firefighting systems.
- 30 CFR 250.860 · Chemical firefighting system.
- 30 CFR 250.861 · Foam firefighting systems.
- 30 CFR 250.862 · Fire and gas-detection systems.
- 30 CFR 250.863 · Electrical equipment.
- 30 CFR 250.864 · Erosion.
- 30 CFR 250.865 · Surface pumps.
- 30 CFR 250.866 · Personnel safety equipment.
- 30 CFR 250.867 · Temporary quarters and temporary equipment.
- 30 CFR 250.868 · Non-metallic piping.
- 30 CFR 250.869 · General platform operations.
- 30 CFR 250.870 · Time delays on pressure safety low (PSL) sensors.
- 30 CFR 250.871 · Welding and burning practices and procedures.
- 30 CFR 250.872 · Atmospheric vessels.
- 30 CFR 250.873 · Subsea gas lift requirements.
- 30 CFR 250.874 · Subsea water injection systems.
- 30 CFR 250.875 · Subsea pump systems.
- 30 CFR 250.876 · Fired and exhaust heated components.
- 30 CFR 250.877-250.879 · §§ 250.877-250.879 [Reserved]
- 30 CFR 250.880 · Production safety system testing.
- 30 CFR 250.881-250.889 · §§ 250.881-250.889 [Reserved]
- 30 CFR 250.890 · Records.
- 30 CFR 250.891 · Safety device training.
- 30 CFR 250.892-250.899 · §§ 250.892-250.899 [Reserved]
- 30 CFR 250.900 · What general requirements apply to all platforms?
- 30 CFR 250.901 · What industry standards must your platform meet?
- 30 CFR 250.902 · What are the requirements for platform removal and location clearance?
- 30 CFR 250.903 · What records must I keep?
- 30 CFR 250.904 · What is the Platform Approval Program?
- 30 CFR 250.905 · How do I get approval for the installation, modification, or repair of my platform?
- 30 CFR 250.906 · What must I do to obtain approval for the proposed site of my platform?
- 30 CFR 250.907 · Where must I locate foundation boreholes?
- 30 CFR 250.908 · What are the minimum structural fatigue design requirements?
- 30 CFR 250.909 · What is the Platform Verification Program?
- 30 CFR 250.910 · Which of my facilities are subject to the Platform Verification Program?
- 30 CFR 250.911 · If my platform is subject to the Platform Verification Program, what must I do?
- 30 CFR 250.912 · What plans must I submit under the Platform Verification Program?
- 30 CFR 250.913 · When must I resubmit Platform Verification Program plans?
- 30 CFR 250.914 · How do I nominate a CVA?
- 30 CFR 250.915 · What are the CVA's primary responsibilities?
- 30 CFR 250.916 · What are the CVA's primary duties during the design phase?
- 30 CFR 250.917 · What are the CVA's primary duties during the fabrication phase?
- 30 CFR 250.918 · What are the CVA's primary duties during the installation phase?
- 30 CFR 250.919 · What in-service inspection requirements must I meet?
- 30 CFR 250.920 · What are the BSEE requirements for assessment of fixed platforms?
- 30 CFR 250.921 · How do I analyze my platform for cumulative fatigue?
- 30 CFR 250.1000 · General requirements.
- 30 CFR 250.1001 · Definitions.
- 30 CFR 250.1002 · Design requirements for DOI pipelines.
- 30 CFR 250.1003 · Installation, testing, and repair requirements for DOI pipelines.
- 30 CFR 250.1004 · Safety equipment requirements for DOI pipelines.
- 30 CFR 250.1005 · Inspection requirements for DOI pipelines.
- 30 CFR 250.1006 · How must I decommission and take out of service a DOI pipeline?
- 30 CFR 250.1007 · What to include in applications.
- 30 CFR 250.1008 · Reports.
- 30 CFR 250.1009 · Requirements to obtain pipeline right-of-way grants.
- 30 CFR 250.1010 · General requirements for pipeline right-of-way holders.
- 30 CFR 250.1011 · [Reserved]
- 30 CFR 250.1012 · Required payments for pipeline right-of-way holders.
- 30 CFR 250.1013 · Grounds for forfeiture of pipeline right-of-way grants.
- 30 CFR 250.1014 · When pipeline right-of-way grants expire.
- 30 CFR 250.1015 · Applications for pipeline right-of-way grants.
- 30 CFR 250.1016 · Granting pipeline rights-of-way.
- 30 CFR 250.1017 · Requirements for construction under pipeline right-of-way grants.
- 30 CFR 250.1018 · Assignment of pipeline right-of-way grants.
- 30 CFR 250.1019 · Relinquishment of pipeline right-of-way grants.
- 30 CFR 250.1150 · What are the general reservoir production requirements?
- 30 CFR 250.1151 · How often must I conduct well production tests?
- 30 CFR 250.1152 · How do I conduct well tests?
- 30 CFR 250.1153-250.1155 · §§ 250.1153-250.1155 [Reserved]
- 30 CFR 250.1156 · What steps must I take to receive approval to produce within 500 feet of a unit or lease line?
- 30 CFR 250.1157 · How do I receive approval to produce gas-cap gas from an oil reservoir with an associated gas cap?
- 30 CFR 250.1158 · How do I receive approval to downhole commingle hydrocarbons?
- 30 CFR 250.1159 · May the Regional Supervisor limit my well or reservoir production rates?
- 30 CFR 250.1160 · When may I flare or vent gas?
- 30 CFR 250.1161 · When may I flare or vent gas for extended periods of time?
- 30 CFR 250.1162 · When may I burn produced liquid hydrocarbons?
- 30 CFR 250.1163 · How must I measure gas flaring or venting volumes and liquid hydrocarbon burning volumes, and what records must I maintain?
- 30 CFR 250.1164 · What are the requirements for flaring or venting gas containing H2S?
- 30 CFR 250.1165 · What must I do for enhanced recovery operations?
- 30 CFR 250.1166 · What additional reporting is required for developments in the Alaska OCS Region?
- 30 CFR 250.1167 · What information must I submit with forms and for approvals?
- 30 CFR 250.1200 · Question index table.
- 30 CFR 250.1201 · Definitions.
- 30 CFR 250.1202 · Liquid hydrocarbon measurement.
- 30 CFR 250.1203 · Gas measurement.
- 30 CFR 250.1204 · Surface commingling.
- 30 CFR 250.1205 · Site security.
- 30 CFR 250.1300 · What is the purpose of this subpart?