Browse Federal regulations
Read the original sections, or search by topic.
- 30 CFR 783.21 · Soil resources information.
- 30 CFR 783.24 · Maps: General requirements.
- 30 CFR 783.25 · Cross sections, maps, and plans.
- 30 CFR 784.1 · Scope.
- 30 CFR 784.2 · Objectives.
- 30 CFR 784.4 · Responsibilities.
- 30 CFR 784.10 · Information collection.
- 30 CFR 784.11 · Operation plan: General requirements.
- 30 CFR 784.12 · Operation plan: Existing structures.
- 30 CFR 784.13 · Reclamation plan: General requirements.
- 30 CFR 784.14 · Hydrologic information.
- 30 CFR 784.15 · Reclamation plan: Land use information.
- 30 CFR 784.16 · Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments.
- 30 CFR 784.17 · Protection of publicly owned parks and historic places.
- 30 CFR 784.18 · Relocation or use of public roads.
- 30 CFR 784.19 · Underground development waste.
- 30 CFR 784.20 · Subsidence control plan.
- 30 CFR 784.21 · Fish and wildlife information.
- 30 CFR 784.22 · Geologic information.
- 30 CFR 784.23 · Operation plan: Maps and plans.
- 30 CFR 784.24 · Road systems.
- 30 CFR 784.25 · Return of coal processing waste to abandoned underground workings.
- 30 CFR 784.26 · Air pollution control plan.
- 30 CFR 784.29 · Diversions.
- 30 CFR 784.30 · Support facilities.
- 30 CFR 784.200 · Interpretive rules related to General Performance Standards.
- 30 CFR 785.1 · Scope.
- 30 CFR 785.2 · Objective.
- 30 CFR 785.10 · Information collection.
- 30 CFR 785.11 · Anthracite surface coal mining and reclamation operations.
- 30 CFR 785.12 · Special bituminous surface coal mining and reclamation operations.
- 30 CFR 785.13 · Experimental practices mining.
- 30 CFR 785.14 · Mountaintop removal mining.
- 30 CFR 785.15 · Steep slope mining.
- 30 CFR 785.16 · Permits incorporating variances from approximate original contour restoration requirements for steep slope mining.
- 30 CFR 785.17 · Prime farmland.
- 30 CFR 785.18 · Variances for delay in contemporaneous reclamation requirement in combined surface and underground mining activities.
- 30 CFR 785.19 · Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial valley floors in the arid and semiarid areas west of the 100th meridian.
- 30 CFR 785.20 · Augering.
- 30 CFR 785.21 · Coal preparation plants not located within the permit area of a mine.
- 30 CFR 785.22 · In situ processing activities.
- 30 CFR 785.25 · Lands eligible for remining.
- 30 CFR 795.1 · Scope and purpose.
- 30 CFR 795.3 · Definitions.
- 30 CFR 795.4 · Information collection.
- 30 CFR 795.5 · Grant application procedures.
- 30 CFR 795.6 · Eligibility for assistance.
- 30 CFR 795.7 · Filing for assistance.
- 30 CFR 795.8 · Application approval and notice.
- 30 CFR 795.9 · Program services and data requirements.
- 30 CFR 795.10 · Qualified laboratories.
- 30 CFR 795.11 · Assistance funding.
- 30 CFR 795.12 · Applicant liability.
- 30 CFR 800.1 · Scope and purpose.
- 30 CFR 800.4 · Regulatory authority responsibilities.
- 30 CFR 800.5 · Definitions.
- 30 CFR 800.10 · Information collection.
- 30 CFR 800.11 · Requirement to file a bond.
- 30 CFR 800.12 · Form of the performance bond.
- 30 CFR 800.13 · Period of liability.
- 30 CFR 800.14 · Determination of bond amount.
- 30 CFR 800.15 · Adjustment of amount.
- 30 CFR 800.16 · General terms and conditions of bond.
- 30 CFR 800.17 · Bonding requirements for underground coal mines and long-term coal-related surface facilities and structures.
- 30 CFR 800.20 · Surety bonds.
- 30 CFR 800.21 · Collateral bonds.
- 30 CFR 800.23 · Self-bonding.
- 30 CFR 800.30 · Replacement of bonds.
- 30 CFR 800.40 · Requirement to release performance bonds.
- 30 CFR 800.50 · Forfeiture of bonds.
- 30 CFR 800.60 · Terms and conditions for liability insurance.
- 30 CFR 800.70 · Bonding for anthracite operations in Pennsylvania.
- 30 CFR 810.1 · Scope.
- 30 CFR 810.2 · Objective.
- 30 CFR 810.3 · Authority.
- 30 CFR 810.4 · Responsibility.
- 30 CFR 810.11 · Applicability.
- 30 CFR 815.1 · Scope and purpose.
- 30 CFR 815.2 · Permitting information.
- 30 CFR 815.13 · Required documents.
- 30 CFR 815.15 · Performance standards for coal exploration.
- 30 CFR 816.1 · Scope.
- 30 CFR 816.2 · Objectives.
- 30 CFR 816.10 · Information collection.
- 30 CFR 816.11 · Signs and markers.
- 30 CFR 816.13 · Casing and sealing of drilled holes: General requirements.
- 30 CFR 816.14 · Casing and sealing of drilled holes: Temporary.
- 30 CFR 816.15 · Casing and sealing of drilled holes: Permanent.
- 30 CFR 816.22 · Topsoil and subsoil.
- 30 CFR 816.41 · Hydrologic-balance protection.
- 30 CFR 816.42 · Hydrologic balance: Water quality standards and effluent limitations.
- 30 CFR 816.43 · Diversions.
- 30 CFR 816.45 · Hydrologic balance: Sediment control measures.
- 30 CFR 816.46 · Hydrologic balance: Siltation structures.
- 30 CFR 816.47 · Hydrologic balance: Discharge structures.
- 30 CFR 816.49 · Impoundments.
- 30 CFR 816.56 · Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
- 30 CFR 816.57 · Hydrologic balance: Stream buffer zones.
- 30 CFR 816.59 · Coal recovery.
- 30 CFR 816.61 · Use of explosives: General requirements.