Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 60.5560a · a What records must I maintain?
- 40 CFR 60.5565a · a In what form and how long must I keep my records?
- 40 CFR 60.5570a · a What parts of the general provisions apply to my affected EGU?
- 40 CFR 60.5575a · a Who implements and enforces this subpart?
- 40 CFR 60.5580a · a What definitions apply to this subpart?
- 40 CFR Table 1 to Subpart TTTTa of Part 60 · Table 1 to Subpart TTTTa of Part 60—CO2 Emission Standards for Affected Stationary Combustion Turbines That Commenced Construction or Reconstruction After May 23, 2023 (Gross or Net Energy Output-Based Standards Applicable as Approved by the Administrator)
- 40 CFR Table 2 to Subpart TTTTa of Part 60 · Table 2 to Subpart TTTTa of Part 60—CO2 Emission Standards for Affected Steam Generating Units or IGCC That Commenced Modification After May 23, 2023
- 40 CFR Table 3 to Subpart TTTTa of Part 60 · Table 3 to Subpart TTTTa of Part 60—Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTTa
- 40 CFR 60.5700b · b What is the purpose of this subpart?
- 40 CFR 60.5705b · b Which pollutants are regulated by this subpart?
- 40 CFR 60.5710b · b Am I affected by this subpart?
- 40 CFR 60.5715b · b What is the review and approval process for my State plan?
- 40 CFR 60.5720b · b What if I do not submit a State plan or my State plan is not approvable?
- 40 CFR 60.5725b · b In lieu of a State plan submittal, are there other acceptable option(s) for a State to meet its CAA section 111(d) obligations?
- 40 CFR 60.5730b · b Is there an approval process for a negative declaration letter?
- 40 CFR 60.5740b · b What must I include in my federally enforceable State plan?
- 40 CFR 60.5775b · b What standards of performance must I include in my State plan?
- 40 CFR 60.5780b · b What compliance dates and compliance periods must I include in my State plan?
- 40 CFR 60.5785b · b What are the timing requirements for submitting my State plan?
- 40 CFR 60.5790b · b What is the procedure for revising my State plan?
- 40 CFR 60.5795b · b Commitment to review emission guidelines for coal-fired affected EGUs
- 40 CFR 60.5840b · b Does this subpart directly affect EGU owners or operators in my State?
- 40 CFR 60.5845b · b What affected EGUs must I address in my State plan?
- 40 CFR 60.5850b · b What EGUs are excluded from being affected EGUs?
- 40 CFR 60.5860b · b What applicable monitoring, recordkeeping, and reporting requirements do I need to include in my State plan for affected EGUs?
- 40 CFR 60.5865b · b What are my recordkeeping requirements?
- 40 CFR 60.5870b · b What are my reporting and notification requirements?
- 40 CFR 60.5875b · b How do I submit information required by these emission guidelines to the EPA?
- 40 CFR 60.5876b · b What are the recordkeeping and reporting requirements for EGUs that have committed to permanently cease operations by January 1, 2032?
- 40 CFR 60.5880b · b What definitions apply to this subpart?
- 40 CFR 60.5680 · What does this subpart do?
- 40 CFR 60.5685 · When does this subpart become effective?
- 40 CFR 60.5690 · Does this subpart apply to my municipal waste combustor?
- 40 CFR 60.5695 · What is a new municipal waste combustor?
- 40 CFR 60.5700 · Does this subpart allow any exemptions?
- 40 CFR 60.5705 · Do other new source performance standards also apply to my municipal waste combustor?
- 40 CFR 60.5710 · What authorities to enforce these federal new source performance standards can the Administrator delegate to a state agency?
- 40 CFR 60.5715 · How are these new source performance standards structured?
- 40 CFR 60.5720 · Do all five components of these new source performance standards apply at the same time?
- 40 CFR 60.5725 · Are there different subcategories of municipal waste combustors within this subpart?
- 40 CFR 60.5730 · Who must submit a materials separation plan?
- 40 CFR 60.5735 · What is a materials separation plan?
- 40 CFR 60.5740 · What steps must I complete for my materials separation plan?
- 40 CFR 60.5745 · What must I include in my draft materials separation plan?
- 40 CFR 60.5750 · How do I make my draft materials separation plan available to the public?
- 40 CFR 60.5755 · When must I accept comments on the materials separation plan?
- 40 CFR 60.5760 · Where and when must I hold a public meeting on my draft materials separation plan?
- 40 CFR 60.5765 · What must I do with any public comments I receive during the public comment period on my draft materials separation plan?
- 40 CFR 60.5770 · What must I do with my revised materials separation plan?
- 40 CFR 60.5775 · What must I include in the public meeting on my revised materials separation plan and siting analysis?
- 40 CFR 60.5780 · What must I do with any public comments I receive on my revised materials separation plan?
- 40 CFR 60.5785 · How do I submit my final materials separation plan?
- 40 CFR 60.5790 · Who must submit a siting analysis?
- 40 CFR 60.5795 · What is a siting analysis?
- 40 CFR 60.5800 · What steps must I complete for my siting analysis?
- 40 CFR 60.5805 · What must I include in my siting analysis?
- 40 CFR 60.5810 · How do I make my siting analysis available to the public?
- 40 CFR 60.5815 · When must I accept comments on the siting analysis and revised materials separation plan?
- 40 CFR 60.5820 · Where and when must I hold a public meeting on the siting analysis?
- 40 CFR 60.5825 · What must I do with any public comments I receive during the public comment period on my siting analysis?
- 40 CFR 60.5830 · How do I submit my siting analysis?
- 40 CFR 60.5835 · What types of training must I do?
- 40 CFR 60.5840 · Who must complete the operator training course? By when?
- 40 CFR 60.5845 · Who must complete the site-specific training course?
- 40 CFR 60.5850 · What site-specific training must I provide?
- 40 CFR 60.5855 · What information must I include in the site-specific operating manual?
- 40 CFR 60.5860 · Where must I keep the site-specific operating manual?
- 40 CFR 60.5865 · What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
- 40 CFR 60.5870 · After the required date for operator certification, who may operate the municipal waste combustor?
- 40 CFR 60.5875 · What if all the certified operators must be temporarily offsite?
- 40 CFR 60.5880 · What are the operating practice requirements for my municipal waste combustor?
- 40 CFR 60.5885 · What happens to the operating requirements during periods of startup, shutdown, and malfunction?
- 40 CFR 60.5890 · What pollutants are regulated by this subpart?
- 40 CFR 60.5895 · What emission limits must I meet? By when?
- 40 CFR 60.5900 · What happens to the emission limits during periods of startup, shutdown, and malfunction?
- 40 CFR 60.5905 · What types of continuous emission monitoring must I perform?
- 40 CFR 60.5910 · What continuous emission monitoring systems must I install for gaseous pollutants?
- 40 CFR 60.5915 · How are the data from the continuous emission monitoring systems used?
- 40 CFR 60.5920 · How do I make sure my continuous emission monitoring systems are operating correctly?
- 40 CFR 60.5925 · What is my schedule for evaluating continuous emission monitoring systems?
- 40 CFR 60.5930 · What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
- 40 CFR 60.5935 · What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
- 40 CFR 60.5940 · How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
- 40 CFR 60.5945 · What is required for my continuous opacity monitoring system and how are the data used?
- 40 CFR 60.5950 · What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
- 40 CFR 60.5955 · What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
- 40 CFR 60.5960 · What types of stack tests must I conduct?
- 40 CFR 60.5965 · How are the stack test data used?
- 40 CFR 60.5970 · What schedule must I follow for the stack testing?
- 40 CFR 60.5975 · What procedures and test methods must I use to stack test?
- 40 CFR 60.5980 · May I conduct stack testing less often?
- 40 CFR 60.5985 · May I conduct continuous monitoring or sampling in lieu of stack testing?
- 40 CFR 60.5990 · Must I meet other requirements for continuous monitoring?
- 40 CFR 60.5995 · How do I monitor the load of my municipal waste combustor?
- 40 CFR 60.6000 · How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
- 40 CFR 60.6005 · How do I monitor the injection rate of activated carbon?
- 40 CFR 60.6010 · What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems?
- 40 CFR 60.6015 · What requirements must I meet for estimating my municipal waste combustor capacity?
- 40 CFR 60.6020 · What records must I keep?
- 40 CFR 60.6025 · Where must I keep my records and for how long?