Browse Federal regulations
Read the original sections, or search by topic.
- 43 CFR 3173.4 · Federal seals.
- 43 CFR 3173.5 · Removing production from tanks for sale and transportation by truck.
- 43 CFR 3173.6 · Water-draining operations.
- 43 CFR 3173.7 · Hot oiling, clean-up, and completion operations.
- 43 CFR 3173.8 · Report of theft or mishandling of production.
- 43 CFR 3173.9 · Required recordkeeping for inventory and seal records.
- 43 CFR 3173.10 · Form 3160-5, Sundry Notices and Reports on Wells.
- 43 CFR 3173.11 · Site facility diagram.
- 43 CFR 3173.12 · Applying for a facility measurement point.
- 43 CFR 3173.13 · Requirements for approved facility measurement points.
- 43 CFR 3173.14 · Conditions for commingling and allocation approval (surface and downhole).
- 43 CFR 3173.15 · Applying for a commingling and allocation approval.
- 43 CFR 3173.16 · Existing commingling and allocation approvals.
- 43 CFR 3173.17 · Relationship of a commingling and allocation approval to royalty-free use of production.
- 43 CFR 3173.18 · Modification of a commingling and allocation approval.
- 43 CFR 3173.19 · Effective date of a commingling and allocation approval.
- 43 CFR 3173.20 · Terminating a commingling and allocation approval.
- 43 CFR 3173.21 · Combining production downhole in certain circumstances.
- 43 CFR 3173.22 · Requirements for off-lease measurement.
- 43 CFR 3173.23 · Applying for off-lease measurement.
- 43 CFR 3173.24 · Effective date of an off-lease measurement approval.
- 43 CFR 3173.25 · Existing approved off-lease measurement.
- 43 CFR 3173.26 · Relationship of off-lease measurement approval to royalty-free use of production.
- 43 CFR 3173.27 · Termination of off-lease measurement approval.
- 43 CFR 3173.28 · Instances not constituting off-lease measurement, for which no approval is required.
- 43 CFR 3173.29 · Immediate assessments for certain violations.
- 43 CFR Appendix A to Subpart 3173 of Part 3170 · Appendix A to Subpart 3173 of Part 3170—Examples of Site Facility Diagrams
- 43 CFR 3174.1 · Definitions and acronyms.
- 43 CFR 3174.2 · General requirements.
- 43 CFR 3174.3 · Incorporation by reference (IBR).
- 43 CFR 3174.4 · Specific measurement performance requirements.
- 43 CFR 3174.5 · Oil measurement by tank gauging—general requirements.
- 43 CFR 3174.6 · Oil measurement by tank gauging—procedures.
- 43 CFR 3174.7 · LACT system—general requirements.
- 43 CFR 3174.8 · LACT system—components and operating requirements.
- 43 CFR 3174.9 · Coriolis measurement systems (CMS)—general requirements and components.
- 43 CFR 3174.10 · Coriolis meter for LACT and CMS measurement applications—operating requirements.
- 43 CFR 3174.11 · Meter-proving requirements.
- 43 CFR 3174.12 · Measurement tickets.
- 43 CFR 3174.13 · Oil measurement by other methods.
- 43 CFR 3174.14 · Determination of oil volumes by methods other than measurement.
- 43 CFR 3174.15 · Immediate assessments.
- 43 CFR 3175.10 · Definitions and acronyms.
- 43 CFR 3175.20 · General requirements.
- 43 CFR 3175.30 · Incorporation by reference.
- 43 CFR 3175.31 · Specific performance requirements.
- 43 CFR 3175.40 · Measurement equipment approved by standard or make and model.
- 43 CFR 3175.41 · Flange-tapped orifice plates.
- 43 CFR 3175.42 · Chart recorders.
- 43 CFR 3175.43 · Transducers.
- 43 CFR 3175.44 · Flow-computer software.
- 43 CFR 3175.45 · Gas chromatographs.
- 43 CFR 3175.46 · Isolating flow conditioners.
- 43 CFR 3175.47 · Differential primary devices other than flange-tapped orifice plates.
- 43 CFR 3175.48 · Linear measurement devices.
- 43 CFR 3175.49 · Accounting systems.
- 43 CFR 3175.60 · Timeframes for compliance.
- 43 CFR 3175.61 · Grandfathering.
- 43 CFR 3175.70 · Measurement location.
- 43 CFR 3175.80 · Flange-tapped orifice plates (primary devices).
- 43 CFR 3175.90 · Mechanical recorder (secondary device).
- 43 CFR 3175.91 · Installation and operation of mechanical recorders.
- 43 CFR 3175.92 · Verification and calibration of mechanical recorders.
- 43 CFR 3175.93 · Integration statements.
- 43 CFR 3175.94 · Volume determination.
- 43 CFR 3175.100 · Electronic gas measurement (secondary and tertiary device).
- 43 CFR 3175.101 · Installation and operation of electronic gas measurement systems.
- 43 CFR 3175.102 · Verification and calibration of electronic gas measurement systems.
- 43 CFR 3175.103 · Flow rate, volume, and average value calculation.
- 43 CFR 3175.104 · Logs and records.
- 43 CFR 3175.110 · Gas sampling and analysis.
- 43 CFR 3175.111 · General sampling requirements.
- 43 CFR 3175.112 · Sampling probe and tubing.
- 43 CFR 3175.113 · Spot samples—general requirements.
- 43 CFR 3175.114 · Spot samples—allowable methods.
- 43 CFR 3175.115 · Spot samples—frequency.
- 43 CFR 3175.116 · Composite sampling methods.
- 43 CFR 3175.117 · On-line gas chromatographs.
- 43 CFR 3175.118 · Gas chromatograph requirements.
- 43 CFR 3175.119 · Components to analyze.
- 43 CFR 3175.120 · Gas analysis report requirements.
- 43 CFR 3175.121 · Effective date of a spot or composite gas sample.
- 43 CFR 3175.125 · Calculation of heating value and volume
- 43 CFR 3175.126 · Reporting of heating value and volume.
- 43 CFR 3175.130 · Transducer testing protocol.
- 43 CFR 3175.131 · General requirements for transducer testing.
- 43 CFR 3175.132 · Testing of reference accuracy.
- 43 CFR 3175.133 · Testing of influence effects.
- 43 CFR 3175.134 · Transducer test reporting.
- 43 CFR 3175.135 · Uncertainty determination.
- 43 CFR 3175.140 · Flow-computer software testing.
- 43 CFR 3175.141 · General requirements for flow-computer software testing.
- 43 CFR 3175.142 · Required static tests.
- 43 CFR 3175.143 · Required dynamic tests.
- 43 CFR 3175.144 · Flow-computer software test reporting.
- 43 CFR 3175.150 · Immediate assessments.
- 43 CFR Appendix A to Subpart 3175 of Part 3170 · Appendix A to Subpart 3175 of Part 3170—Table of Atmospheric Pressures
- 43 CFR 3176.1 · Authority.
- 43 CFR 3176.2 · Purpose.
- 43 CFR 3176.3 · Scope.