Browse Federal regulations
Read the original sections, or search by topic.
- 7 CFR 1724.75-1724.99 · §§ 1724.75-1724.99 [Reserved]
- 7 CFR 1726.1-1726.9 · §§ 1726.1-1726.9 [Reserved]
- 7 CFR 1726.10 · Introduction.
- 7 CFR 1726.11 · Purpose.
- 7 CFR 1726.12 · Applicability.
- 7 CFR 1726.13 · Waivers.
- 7 CFR 1726.14 · Definitions.
- 7 CFR 1726.15 · “Buy American”.
- 7 CFR 1726.16 · Debarment and suspension.
- 7 CFR 1726.17 · Restrictions on lobbying.
- 7 CFR 1726.18 · Pre-loan contracting.
- 7 CFR 1726.19 · Use of competitive procurement.
- 7 CFR 1726.20 · Standards and specifications.
- 7 CFR 1726.21 · New materials.
- 7 CFR 1726.22 · Methods of construction.
- 7 CFR 1726.23 · Qualification of bidders.
- 7 CFR 1726.24 · Standard forms of contracts for borrowers.
- 7 CFR 1726.25 · Subcontracts.
- 7 CFR 1726.26 · Interest on overdue accounts.
- 7 CFR 1726.27 · Contractor's bonds.
- 7 CFR 1726.28-1726.34 · §§ 1726.28-1726.34 [Reserved]
- 7 CFR 1726.35 · Submission of documents to RUS.
- 7 CFR 1726.36 · Documents subject to RUS approval.
- 7 CFR 1726.37 · OMB control number.
- 7 CFR 1726.38-1726.49 · §§ 1726.38-1726.49 [Reserved]
- 7 CFR 1726.50 · Distribution line materials and equipment.
- 7 CFR 1726.51 · Distribution line construction.
- 7 CFR 1726.52-1726.74 · §§ 1726.52-1726.74 [Reserved]
- 7 CFR 1726.75 · General.
- 7 CFR 1726.76 · Substation and transmission line materials and equipment.
- 7 CFR 1726.77 · Substation and transmission line construction.
- 7 CFR 1726.78-1726.124 · §§ 1726.78-1726.124 [Reserved]
- 7 CFR 1726.125 · Generating plant facilities.
- 7 CFR 1726.126-1726.149 · §§ 1726.126-1726.149 [Reserved]
- 7 CFR 1726.150 · Headquarters buildings.
- 7 CFR 1726.151-1726.174 · §§ 1726.151-1726.174 [Reserved]
- 7 CFR 1726.175 · General plant materials.
- 7 CFR 1726.176 · Communications and control facilities.
- 7 CFR 1726.177-1726.199 · §§ 1726.177-1726.199 [Reserved]
- 7 CFR 1726.200 · General requirements.
- 7 CFR 1726.201 · Formal competitive bidding.
- 7 CFR 1726.202 · Informal competitive bidding.
- 7 CFR 1726.203 · Multiparty negotiation.
- 7 CFR 1726.204 · [Reserved]
- 7 CFR 1726.205 · Multiparty lump sum quotations.
- 7 CFR 1726.206-1726.249 · §§ 1726.206-1726.249 [Reserved]
- 7 CFR 1726.250 · General.
- 7 CFR 1726.251 · Prior approved contract modification related to price escalation on transmission equipment, generation equipment, and generation construction contracts.
- 7 CFR 1726.252 · Prior approved contract modification related to liability for special and consequential damages.
- 7 CFR 1726.253 · Prior approved contract modification related to alternative bid provision for payment to contractor for bulk purchase of materials.
- 7 CFR 1726.254 · [Reserved]
- 7 CFR 1726.255 · Prior approved contract modifications related to indemnification.
- 7 CFR 1726.256-1726.299 · §§ 1726.256-1726.299 [Reserved]
- 7 CFR 1726.300 · Standard forms of contracts for borrowers.
- 7 CFR 1726.301 · Borrower contractual obligations.
- 7 CFR 1726.302 · Notice and publication of listed contract forms.
- 7 CFR 1726.303 · Promulgation of new or revised contract forms.
- 7 CFR 1726.304 · List of electric program standard contract forms.
- 7 CFR 1726.305-1726.399 · §§ 1726.305-1726.399 [Reserved]
- 7 CFR 1726.400 · Final contract amendment.
- 7 CFR 1726.401 · Material contract closeout.
- 7 CFR 1726.402 · Equipment contract closeout.
- 7 CFR 1726.403 · Project construction contract closeout.
- 7 CFR 1726.404 · Non-site specific construction contract closeout.
- 7 CFR 1726.405 · Inventory of work orders (RUS Form 219).
- 7 CFR 1728.10 · General purpose and scope.
- 7 CFR 1728.20 · Establishment of standards and specifications.
- 7 CFR 1728.30 · Inclusion of an item for listing or technical acceptance.
- 7 CFR 1728.40 · Procedure for submission of a proposal.
- 7 CFR 1728.50 · Removal of an item from listing or technical acceptance.
- 7 CFR 1728.60 · List of materials and equipment.
- 7 CFR 1728.70 · Procurement of materials.
- 7 CFR 1728.97 · Incorporation by reference of electric standards and specifications.
- 7 CFR 1728.98 · Electric standards and specifications.
- 7 CFR 1728.201 · Bulletin 1728H-701, Specification for Wood Crossarms (Solid and Laminated), Transmission Timbers and Pole Keys.
- 7 CFR 1728.202 · Bulletin 1728H-702, Specification for Quality Control and Inspection of Timber Products.
- 7 CFR 1728.203 · Inspector's qualifications.
- 7 CFR 1728.204 · Electric standards and specifications for materials and construction.
- 7 CFR 1730.1 · Introduction.
- 7 CFR 1730.2 · RUS policy.
- 7 CFR 1730.3 · RUS addresses.
- 7 CFR 1730.4 · Definitions.
- 7 CFR 1730.5-1730.19 · §§ 1730.5-1730.19 [Reserved]
- 7 CFR 1730.20 · General.
- 7 CFR 1730.21 · Inspections and tests.
- 7 CFR 1730.22 · Borrower analysis.
- 7 CFR 1730.23 · Review rating summary, RUS Form 300.
- 7 CFR 1730.24 · RUS review and evaluation.
- 7 CFR 1730.25 · Corrective action.
- 7 CFR 1730.26 · Certification.
- 7 CFR 1730.27 · Vulnerability and Risk Assessment (VRA).
- 7 CFR 1730.28 · Emergency Restoration Plan (ERP).
- 7 CFR 1730.29 · Grants and Grantees.
- 7 CFR 1730.30-1730.59 · §§ 1730.30-1730.59 [Reserved]
- 7 CFR 1730.60 · General.
- 7 CFR 1730.61 · RUS policy.
- 7 CFR 1730.62 · Definitions.
- 7 CFR 1730.63 · IDR policy criteria.
- 7 CFR 1730.64 · Power purchase agreements.
- 7 CFR 1730.65 · Effective dates.