Browse Federal regulations
Read the original sections, or search by topic.
- 10 CFR 51.23 · Environmental impacts of continued storage of spent nuclear fuel beyond the licensed life for operation of a reactor.
- 10 CFR 51.25 · Determination to prepare environmental impact statement or environmental assessment; eligibility for categorical exclusion.
- 10 CFR 51.26 · Requirement to publish notice of intent and conduct scoping process.
- 10 CFR 51.27 · Notice of intent.
- 10 CFR 51.28 · Scoping—participants.
- 10 CFR 51.29 · Scoping-environmental impact statement and supplement to environmental impact statement.
- 10 CFR 51.30 · Environmental assessment.
- 10 CFR 51.31 · Determinations based on environmental assessment.
- 10 CFR 51.32 · Finding of no significant impact.
- 10 CFR 51.33 · Draft finding of no significant impact; distribution.
- 10 CFR 51.34 · Preparation of finding of no significant impact.
- 10 CFR 51.35 · Requirement to publish finding of no significant impact; limitation on Commission action.
- 10 CFR 51.40 · Consultation with NRC staff.
- 10 CFR 51.41 · Requirement to submit environmental information.
- 10 CFR 51.45 · Environmental report.
- 10 CFR 51.49 · Environmental report—limited work authorization.
- 10 CFR 51.50 · Environmental report—construction permit, early site permit, or combined license stage.
- 10 CFR 51.51 · Uranium fuel cycle environmental data—Table S-3.
- 10 CFR 51.52 · Environmental effects of transportation of fuel and waste—Table S-4.
- 10 CFR 51.53 · Postconstruction environmental reports.
- 10 CFR 51.54 · Environmental report—manufacturing license.
- 10 CFR 51.55 · Environmental report—standard design certification.
- 10 CFR 51.56 · Environmental report—non-power production or utilization facility.
- 10 CFR 51.58 · Environmental report—number of copies; distribution.
- 10 CFR 51.60 · Environmental report—materials licenses.
- 10 CFR 51.61 · Environmental report—independent spent fuel storage installation (ISFSI) or monitored retrievable storage installation (MRS) license.
- 10 CFR 51.62 · Environmental report—land disposal of radioactive waste licensed under 10 CFR part 61.
- 10 CFR 51.66 · Environmental report—number of copies; distribution.
- 10 CFR 51.67 · Environmental information concerning geologic repositories.
- 10 CFR 51.68 · Environmental report—rulemaking.
- 10 CFR 51.70 · Draft environmental impact statement—general.
- 10 CFR 51.71 · Draft environmental impact statement—contents.
- 10 CFR 51.72 · Supplement to draft environmental impact statement.
- 10 CFR 51.73 · Request for comments on draft environmental impact statement.
- 10 CFR 51.74 · Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases.
- 10 CFR 51.75 · Draft environmental impact statement—construction permit, early site permit, or combined license.
- 10 CFR 51.76 · Draft environmental impact statement—limited work authorization.
- 10 CFR 51.77 · Distribution of draft environmental impact statement.
- 10 CFR 51.80 · Draft environmental impact statement—materials license.
- 10 CFR 51.81 · Distribution of draft environmental impact statement.
- 10 CFR 51.85 · Draft environmental impact statement—rulemaking.
- 10 CFR 51.86 · Distribution of draft environmental impact statement.
- 10 CFR 51.88 · Proposals for legislation.
- 10 CFR 51.90 · Final environmental impact statement—general.
- 10 CFR 51.91 · Final environmental impact statement—contents.
- 10 CFR 51.92 · Supplement to the final environmental impact statement.
- 10 CFR 51.93 · Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases.
- 10 CFR 51.94 · Requirement to consider final environmental impact statement.
- 10 CFR 51.95 · Postconstruction environmental impact statements.
- 10 CFR 51.96 · Final supplemental environmental impact statement relying on a generic environmental impact statement for licensing new nuclear reactors.
- 10 CFR 51.97 · Final environmental impact statement—materials license.
- 10 CFR 51.99 · [Reserved]
- 10 CFR 51.100 · Timing of Commission action.
- 10 CFR 51.101 · Limitations on actions.
- 10 CFR 51.102 · Requirement to provide a record of decision; preparation.
- 10 CFR 51.103 · Record of decision—general.
- 10 CFR 51.104 · NRC proceeding using public hearings; consideration of environmental impact statement.
- 10 CFR 51.105 · [Reserved]
- 10 CFR 51.105a · a Public hearings in proceedings for issuance of manufacturing licenses.
- 10 CFR 51.106 · Public hearings in proceedings for issuance of operating licenses.
- 10 CFR 51.107 · [Reserved]
- 10 CFR 51.108 · Public hearings on Commission findings that inspections, tests, analyses, and acceptance criteria of combined licenses are met.
- 10 CFR 51.109 · Public hearings in proceedings for issuance of materials license with respect to a geologic repository.
- 10 CFR 51.110 · [Reserved]
- 10 CFR 51.116 · Notice of intent.
- 10 CFR 51.117 · Draft environmental impact statement—notice of availability.
- 10 CFR 51.118 · Final environmental impact statement—notice of availability.
- 10 CFR 51.119 · Publication of finding of no significant impact; distribution.
- 10 CFR 51.120 · Availability of environmental documents for public inspection.
- 10 CFR 51.121 · Status of NEPA actions.
- 10 CFR 51.122 · List of interested organizations and groups.
- 10 CFR 51.123 · Charges for environmental documents; distribution to public; distribution to governmental agencies.
- 10 CFR 51.124 · Commission duty to comment.
- 10 CFR 51.125 · Responsible official.
- 10 CFR Appendix A to Subpart A of Part 51 · Appendix A to Subpart A of Part 51—Format for Presentation of Material in Environmental Impact Statements
- 10 CFR Appendix B to Subpart A of 10 CFR Part 51 · Appendix B to Subpart A of 10 CFR Part 51—Environmental Effect of Renewing the Operating License of a Nuclear Power Plant
- 10 CFR Appendix C to Subpart A of Part 51 · Appendix C to Subpart A of Part 51—Environmental Effect of Issuing a Permit or License for a New Nuclear Reactor
- 10 CFR 52.0 · Scope; applicability of 10 CFR Chapter I provisions.
- 10 CFR 52.1 · Definitions.
- 10 CFR 52.2 · Interpretations.
- 10 CFR 52.3 · Written communications.
- 10 CFR 52.4 · Deliberate misconduct.
- 10 CFR 52.5 · Employee protection.
- 10 CFR 52.6 · Completeness and accuracy of information.
- 10 CFR 52.7 · Specific exemptions.
- 10 CFR 52.8 · Combining licenses; elimination of repetition.
- 10 CFR 52.9 · Jurisdictional limits.
- 10 CFR 52.10 · Attacks and destructive acts.
- 10 CFR 52.11 · Information collection requirements: OMB approval.
- 10 CFR 52.12 · Scope of subpart.
- 10 CFR 52.13 · Relationship to other subparts.
- 10 CFR 52.15 · Filing of applications.
- 10 CFR 52.16 · Contents of applications; general information.
- 10 CFR 52.17 · Contents of applications; technical information.
- 10 CFR 52.18 · Standards for review of applications.
- 10 CFR 52.21 · Administrative review of applications; hearings.
- 10 CFR 52.23 · Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- 10 CFR 52.24 · Issuance of early site permit.
- 10 CFR 52.25 · Extent of activities permitted.
- 10 CFR 52.26 · Duration of permit.