Browse Federal regulations
Read the original sections, or search by topic.
- 10 CFR 52.27 · Limited work authorization after issuance of early site permit.
- 10 CFR 52.28 · Transfer of early site permit.
- 10 CFR 52.29 · Application for renewal.
- 10 CFR 52.31 · Criteria for renewal.
- 10 CFR 52.33 · Duration of renewal.
- 10 CFR 52.35 · Use of site for other purposes.
- 10 CFR 52.39 · Finality of early site permit determinations.
- 10 CFR 52.41 · Scope of subpart.
- 10 CFR 52.43 · Relationship to other subparts.
- 10 CFR 52.45 · Filing of applications.
- 10 CFR 52.46 · Contents of applications; general information.
- 10 CFR 52.47 · Contents of applications; technical information.
- 10 CFR 52.48 · Standards for review of applications.
- 10 CFR 52.51 · Administrative review of applications.
- 10 CFR 52.53 · Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- 10 CFR 52.54 · Issuance of standard design certification.
- 10 CFR 52.55 · Duration of certification.
- 10 CFR 52.57 · Application for renewal.
- 10 CFR 52.59 · Criteria for renewal.
- 10 CFR 52.61 · Duration of renewal.
- 10 CFR 52.63 · Finality of standard design certifications.
- 10 CFR 52.71 · Scope of subpart.
- 10 CFR 52.73 · Relationship to other subparts.
- 10 CFR 52.75 · Filing of applications.
- 10 CFR 52.77 · Contents of applications; general information.
- 10 CFR 52.79 · Contents of applications; technical information in final safety analysis report.
- 10 CFR 52.80 · Contents of applications; additional technical information.
- 10 CFR 52.81 · Standards for review of applications.
- 10 CFR 52.83 · Finality of referenced NRC approvals; partial initial decision on site suitability.
- 10 CFR 52.85 · Administrative review of applications; hearings.
- 10 CFR 52.87 · Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- 10 CFR 52.89 · [Reserved]
- 10 CFR 52.91 · Authorization to conduct limited work authorization activities.
- 10 CFR 52.93 · Exemptions and variances.
- 10 CFR 52.97 · Issuance of combined licenses.
- 10 CFR 52.98 · Finality of combined licenses; information requests.
- 10 CFR 52.99 · Inspection during construction; ITAAC schedules and notifications; NRC notices.
- 10 CFR 52.103 · Operation under a combined license.
- 10 CFR 52.104 · Duration of combined license.
- 10 CFR 52.105 · Transfer of combined license.
- 10 CFR 52.107 · Application for renewal.
- 10 CFR 52.109 · Continuation of combined license.
- 10 CFR 52.110 · Termination of license.
- 10 CFR 52.131 · Scope of subpart.
- 10 CFR 52.133 · Relationship to other subparts.
- 10 CFR 52.135 · Filing of applications.
- 10 CFR 52.136 · Contents of applications; general information.
- 10 CFR 52.137 · Contents of applications; technical information.
- 10 CFR 52.139 · Standards for review of applications.
- 10 CFR 52.141 · Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- 10 CFR 52.143 · Staff approval of design.
- 10 CFR 52.145 · Finality of standard design approvals; information requests.
- 10 CFR 52.147 · Duration of design approval.
- 10 CFR 52.151 · Scope of subpart.
- 10 CFR 52.153 · Relationship to other subparts.
- 10 CFR 52.155 · Filing of applications.
- 10 CFR 52.156 · Contents of applications; general information.
- 10 CFR 52.157 · Contents of applications; technical information in final safety analysis report.
- 10 CFR 52.158 · Contents of application; additional technical information.
- 10 CFR 52.159 · Standards for review of application.
- 10 CFR 52.161 · [Reserved]
- 10 CFR 52.163 · Administrative review of applications; hearings.
- 10 CFR 52.165 · Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- 10 CFR 52.167 · Issuance of manufacturing license.
- 10 CFR 52.169 · [Reserved]
- 10 CFR 52.171 · Finality of manufacturing licenses; information requests.
- 10 CFR 52.173 · Duration of manufacturing license.
- 10 CFR 52.175 · Transfer of manufacturing license.
- 10 CFR 52.177 · Application for renewal.
- 10 CFR 52.179 · Criteria for renewal.
- 10 CFR 52.181 · Duration of renewal.
- 10 CFR 52.301 · Violations.
- 10 CFR 52.303 · Criminal penalties.
- 10 CFR Appendix A to Part 52 · Appendix A to Part 52—Design Certification Rule for the U.S. Advanced Boiling Water Reactor
- 10 CFR Appendix B to Part 52 · Appendix B to Part 52—Design Certification Rule for the System 80 + Design
- 10 CFR Appendix C to Part 52 · Appendix C to Part 52—Design Certification Rule for the AP600 Design
- 10 CFR Appendix D to Part 52 · Appendix D to Part 52—Design Certification Rule for the AP1000 Design
- 10 CFR Appendix E to Part 52 · Appendix E to Part 52—Design Certification Rule for the ESBWR Design
- 10 CFR Appendix F to Part 52 · Appendix F to Part 52—Design Certification Rule for the APR1400 Design
- 10 CFR Appendix G to Part 52 · Appendix G to Part 52—Design Certification Rule for NuScale
- 10 CFR Appendixes H-M to Part 52 · Appendixes H-M to Part 52 [Reserved]
- 10 CFR Appendix N to Part 52 · Appendix N to Part 52—Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites
- 10 CFR 53.000 · Purpose.
- 10 CFR 53.015 · Scope.
- 10 CFR 53.020 · Definitions.
- 10 CFR 53.030 · [Reserved]
- 10 CFR 53.040 · Written communications.
- 10 CFR 53.050 · Deliberate misconduct.
- 10 CFR 53.060 · Employee protection.
- 10 CFR 53.070 · Completeness and accuracy of information.
- 10 CFR 53.080 · Specific exemptions.
- 10 CFR 53.090 · Standards for review.
- 10 CFR 53.100 · Jurisdictional limits.
- 10 CFR 53.110 · Attacks and destructive acts.
- 10 CFR 53.115 · Rights related to special nuclear material.
- 10 CFR 53.117 · License suspension and rights of recapture.
- 10 CFR 53.120 · Information collection requirements: OMB approval.
- 10 CFR 53.210 · Safety criteria for design-basis accidents.
- 10 CFR 53.220 · Safety criteria for licensing-basis events other than design-basis accidents.
- 10 CFR 53.230 · Safety functions.