Browse Virginia regulations
Read the original sections, or search by topic.
- 4VAC25-165-40 · Agreement to arbitrate
- 4VAC25-165-50 · Conflicts of interest
- 4VAC25-165-60 · Location
- 4VAC25-165-70 · Postponement of arbitration
- 4VAC25-165-80 · Discovery
- 4VAC25-165-90 · Extension of arbitration
- 4VAC25-165-100 · Determination of arbitrator
- 4VAC25-165-110 · Ex parte communications
- 4VAC25-165-120 · Fees
- 4VAC25-165-130 · Disbursement of proceeds
- 4VAC25-170-10 · Definitions
- 4VAC25-170-20 · Resource conservation
- 4VAC25-170-30 · Bonds, permits and fees
- 4VAC25-170-40 · Notification of intent to proceed
- 4VAC25-170-50 · Well construction and maintenance
- 4VAC25-170-60 · Records, logs and general requirements
- 4VAC25-170-70 · Groundwater monitoring
- 4VAC25-170-80 · Abandonment and plugging of wells
- 4VAC25-170-90 · Environmental protection; impacts; noise abatement
- 4VAC50-11-10 · Purpose
- 4VAC50-11-20 · Definitions
- 4VAC50-11-30 · Notification list
- 4VAC50-11-40 · Information to be sent to persons on the notification list
- 4VAC50-11-50 · Public comment
- 4VAC50-11-60 · Petition for rulemaking
- 4VAC50-11-70 · Appointment of regulatory advisory panel
- 4VAC50-11-80 · Appointment of negotiated rulemaking panel
- 4VAC50-11-90 · Meetings
- 4VAC50-11-100 · Public hearings on regulations
- 4VAC50-11-110 · Periodic review of regulations
- 4VAC50-20-10 · Authority
- 4VAC50-20-20 · General provisions
- 4VAC50-20-30 · Definitions
- 4VAC50-20-40 · Hazard potential classifications of impounding structures
- 4VAC50-20-45 · Hazard potential classifications based on low volume roadways.
- 4VAC50-20-50 · Performance standards required for impounding structures
- 4VAC50-20-52 · Incremental damage analysis
- 4VAC50-20-53 · Special criteria for reduced SDF requirement for certain high hazard dams
- 4VAC50-20-54 · Dam break inundation zone analysis
- 4VAC50-20-58 · Local government notifications
- 4VAC50-20-59 · Reporting
- 4VAC50-20-60 · Required permits
- 4VAC50-20-70 · Construction permits
- 4VAC50-20-80 · Alterations permits
- 4VAC50-20-105 · Regular Operation and Maintenance Certificates for high hazard potential or significant hazard potential impounding structures
- 4VAC50-20-125 · Delayed effective date for Spillway Design Flood requirements for impounding structures
- 4VAC50-20-150 · Conditional Operation and Maintenance Certificate for high hazard potential or significant hazard potential impounding structures
- 4VAC50-20-155 · Extension of Operation and Maintenance Certificates
- 4VAC50-20-160 · Additional operation and maintenance requirements
- 4VAC50-20-165 · Agricultural exemption
- 4VAC50-20-170 · Transfer of certificates
- 4VAC50-20-175 · Emergency Action Plan (EAP) for High and Significant Hazard Potential impounding structures
- 4VAC50-20-177 · Emergency Preparedness Plan for low hazard impounding structures
- 4VAC50-20-180 · Inspections
- 4VAC50-20-190 · Right to informal fact-finding proceeding or hearing
- 4VAC50-20-195 · Judicial review
- 4VAC50-20-200 · Enforcement
- 4VAC50-20-210 · Consulting committee
- 4VAC50-20-220 · Unsafe conditions
- 4VAC50-20-230 · Complaints
- 4VAC50-20-240 · Design of structures
- 4VAC50-20-260 · Spillway design
- 4VAC50-20-270 · Principal spillways and outlet works
- 4VAC50-20-280 · Drain requirements
- 4VAC50-20-290 · Life of the impounding structure
- 4VAC50-20-300 · Additional design requirements
- 4VAC50-20-310 · Plans and specifications
- 4VAC50-20-320 · Acceptable design procedures and references
- 4VAC50-20-330 · Other applicable dam safety references
- 4VAC50-20-340 · Authority to establish fees
- 4VAC50-20-350 · Fee submittal procedures
- 4VAC50-20-360 · Fee exemptions
- 4VAC50-20-370 · Construction Permit application fees
- 4VAC50-20-375 · Fee for coverage under the conditional general permit or general permit for low hazard impounding structures
- 4VAC50-20-380 · Regular Operation and Maintenance Certificate application fees
- 4VAC50-20-390 · Conditional Operation and Maintenance Certificate application fees
- 4VAC50-20-395 · Simplified dam break inundation zone analysis fee
- 4VAC50-20-400 · Incremental Damage Analysis review fees
- 4VAC50-20-500 · Registering for coverage under the general permit
- 4VAC50-20-501 · Exemption from general permit requirements for certain low hazard potential impounding structures
- 4VAC50-20-502 · General permit registration statement requirements
- 4VAC50-20-503 · General permit requirements for low hazard potential impounding structures
- 4VAC50-20-504 · Issuance of general permit for low hazard potential impounding structures
- 4VAC50-20-505 · Conditional general permit for low hazard potential impounding structures
- 4VAC50-20-506 · Reapplying for general permit coverage for low hazard potential impounding structures
- 4VAC50-20-507 · Enforcement of general permit requirements for low hazard potential impounding structures
- 4VAC50-20-508 · Transfer of permits
- 4VAC50-30-10 · Renumbered as 9VAC25-840-10
- 4VAC50-30-20 · Renumbered as 9VAC25-840-20
- 4VAC50-30-30 · Renumbered as 9VAC25-840-30
- 4VAC50-30-40 · Renumbered as 9VAC25-840-40
- 4VAC50-30-50 · Renumbered as 9VAC25-840-50
- 4VAC50-30-60 · Renumbered as 9VAC25-840-60
- 4VAC50-30-65 · Renumbered as 9VAC25-840-65
- 4VAC50-30-70 · Renumbered as 9VAC25-840-70
- 4VAC50-30-80 · Renumbered as 9VAC25-840-80
- 4VAC50-30-90 · Renumbered as 9VAC25-840-90
- 4VAC50-30-100 · Renumbered as 9VAC25-840-100
- 4VAC50-50-10 · Renumbered as 9VAC25-850-10
- 4VAC50-50-20 · Renumbered as 9VAC25-850-20