LAB § 7104
Where this section sits in the code
- Labor Code - LAB
- DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]
- PART 3. SAFETY ON BUILDINGS [7100. - 7384.]
- CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]
- ARTICLE 1. Floors and Walls [7100. - 7110.]
If a span of a floor on a building exceeds 13 feet, an intermediate beam shall be used to support the temporary flooring, but spans not to exceed 16 feet may be covered by three-inch planks without an intermediate beam. The intermediate beam shall be of a sufficient strength to sustain a live load of 50 pounds per square foot of the area supported.
Collected 2026-09-14T05:56:33Z. Source file · JSON