LAB § 7105
Where this section sits in the code
- Labor Code - LAB
- DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]
- PART 3. SAFETY ON BUILDINGS [7100. - 7384.]
- CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]
- ARTICLE 1. Floors and Walls [7100. - 7110.]
If building operations are suspended and the temporary flooring required by this article is removed, the building shall be replanked upon the resumption of work so that every man at work has a covered floor not more than two stories below.
Collected 2026-09-14T05:56:33Z. Source file · JSON