LAB § 7261
Where this section sits in the code
- Labor Code - LAB
- DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]
- PART 3. SAFETY ON BUILDINGS [7100. - 7384.]
- CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]
- ARTICLE 4. Structural Steel Framed Buildings [7250. - 7267.]
When gathering and stacking temporary floor plank on a lower floor, in preparation for transferring such plank for use on an upper working floor, the steel erector’s personnel shall remove such plank successively, working toward the last panel of such floor, so that the work is always being done from the planked floor.
Collected 2026-09-14T05:56:33Z. Source file · JSON