LAB § 7260
Where this section sits in the code
- Labor Code - LAB
- DIVISION 5. SAFETY IN EMPLOYMENT [6300. - 9254.]
- PART 3. SAFETY ON BUILDINGS [7100. - 7384.]
- CHAPTER 1. Buildings Under Construction or Repair [7100. - 7267.]
- ARTICLE 4. Structural Steel Framed Buildings [7250. - 7267.]
Prior to removal of temporary floor plank, employees shall be instructed by assigned supervision the steps to be taken to perform the work safely and in proper sequence.
Collected 2026-09-14T05:56:33Z. Source file · JSON