PRC § 3270.1
Where this section sits in the code
- Public Resources Code - PRC
- DIVISION 3. OIL AND GAS [3000. - 3865.]
- CHAPTER 1. Oil and Gas Conservation [3000. - 3473.]
- ARTICLE 4.4. Regulation of Production Facilities [3270. - 3270.6.]
Within three months of its acquisition of a production facility or at the time of the initial production at its production facility, the facility operator shall file with the division a spill contingency plan.
Collected 2026-09-14T05:56:33Z. Source file · JSON