California · Through 2026-09-13

PUC § 100151

Read at publisher ↗
Where this section sits in the code
  1. Public Utilities Code - PUC
  2. DIVISION 10. TRANSIT DISTRICTS [24501. - 107025.]
  3. PART 12. SANTA CLARA VALLEY TRANSPORTATION AUTHORITY [100000. - 100619.]
  4. CHAPTER 5. Powers and Functions of VTA [100110. - 100256.]
  5. ARTICLE 4. Construction Manager/General Contractor Project Delivery Contracts [100150. - 100156.]

(a) Subject to the limitations of this article, the authority may utilize the CMGC project delivery method for public transit projects within its jurisdiction.

(b) The authority may enter into a CMGC project delivery method contract pursuant to this article if, after evaluation of the traditional design-bid-build process of construction and of the CMGC project delivery method in a public meeting, the authority makes a written finding that use of the CMGC project delivery method on the specific project under consideration will accomplish one or more of the following objectives: reduce project costs, expedite the project’s completion, or provide features not achievable through the design-bid-build method. This finding shall be made prior to the authority entering into a CMGC project delivery method contract. In the CMGC project delivery method proposal, the written findings shall be included as part of an application for state funds for a transit project.