WAT § 1395
Where this section sits in the code
- Water Code - WAT
- DIVISION 2. WATER [1000. - 5951.]
- PART 2. APPROPRIATION OF WATER [1200. - 1851.]
- CHAPTER 6. Permits [1375. - 1410.2.]
- ARTICLE 4. Application to Beneficial Use and Construction of Works [1395. - 1398.]
Actual construction work upon any project shall begin within the time specified in the permit, which time shall not be less than 60 days from the date of the permit.
Collected 2026-09-14T05:56:33Z. Source file · JSON