O.C.G.A. § 13-4-3: Alteration of written contract — Requirement of preliminary proof as to material alteration.
Where this section sits in the code
- TITLE 13 Contracts
- CHAPTER 4 Modification, Extinguishment, and Renewal
- Article 1 General Provisions
If the contract is not set forth as the basis of the action, so as to require a denial under oath, an alteration in a material part requires explanation before it can be admitted as evidence. This preliminary proof shall be submitted to the court.
Collected 2026-09-17T19:34:57Z. Source file · JSON