GroundRules
← Search the law
Georgia · Snapshot Public.Resource.Org bulk O.C.G.A., Release 86 (2022-11), retrieved 2026-09-17

O.C.G.A. § 22-3-80: Definitions.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 22 Eminent Domain
  2. CHAPTER 3 Exercise of Power of Eminent Domain for Special Purposes
  3. Article 4 Construction and Operation of Petroleum Pipelines

As used in this article, the term:

(1) “Existing petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(2) “Expansion” shall have the same meaning as set forth in Code Section 12-17-1.

(3) “Extension” shall have the same meaning as set forth in Code Section 12-17-1.

(4) “Maintenance” shall have the same meaning as set forth in Code Section 12-17-1.

(5) “New petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(6) “Parallel petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(7) “Petroleum pipeline” shall have the same meaning as set forth in Code Section 12-17-1.

(8) “Petroleum pipeline company” shall have the same meaning as set forth in Code Section 12-17-1.

Collected 2026-09-17T19:34:57Z. Source file · JSON

Browse this collection