12 GCA § 8506: Interim Meeting.

Read at publisher ↗
Where this section sits in the code
  1. Title 12: Autonomous Agencies
  2. Division 1 - Autonomous Agencies
  3. Chapter 8: Guam Power Authority
  4. ARTICLE 5: NET METERING

GPA is authorized to immediately implement an interim, emergency net metering rate structure wherein Customer generators shall be entitled to receive immediate credit for one hundred percent (100%) of the power generation capacity based on the specifications of the generation equipment installed times the rate the Guam Power Authority currently charges the customer until such time that GPA submits a rate structure to the PUC for the net metering program and it is approved by the PUC. This interim rate shall be subject to PUC revocation at any time.