5 GCA § 59109: Contractor Responsible for Capital Maintenance.
Where this section sits in the code
- Title 5: Government Operations
- Division 5 - Public Works
- Chapter 59: The Public Safety Facilities Construction Initiative Act of 2005
The Contract with the Contractor, and the Lease-Back, shall provide that all capital maintenance and repair of the Public Safety Facility be performed by the Contractor as a separate cost. The Contractor shall be responsible, during the Lease-Back period, for the timely filing of any applicable insurance claims and for the payment of any deductible required to repair a Public Safety Facility covered by an insurance policy on the Public Safety Facility. The terms by which the Contractor is to perform such Capital Maintenance shall be determined as a part of the bid process and shall be part of the conditions of the Contract.
Collected 2026-09-27T02:24:58Z. Source file · JSON