Haw. Rev. Stat. § 269-27.5: Construction of high-voltage electric transmission lines; hearing.
Where this section sits in the code
- HI Code
- Division 1
- Title 15
- Chapter 269
Whenever a public utility plans to place, construct, erect, or otherwise build a new 46 kilovolt or greater high-voltage electric transmission system above the surface of the ground through any residential area, the public utilities commission shall conduct a public hearing prior to its issuance of approval thereof. Notice of the hearing shall be given in the manner provided in section 269-16 for notice of public hearings.