IC 8-1-43-5: "Make-ready infrastructure"
Where this section sits in the code
- TITLE 8. UTILITIES AND TRANSPORTATION
- ARTICLE 1. UTILITIES GENERALLY
- Chapter 43. Pilot Programs for Infrastructure for Public Use Electric Vehicles
Sec. 5. As used in this chapter, "make-ready infrastructure" means the:
(1) structures;
(2) machinery;
(3) equipment;
(4) hardware;
(5) software;
(6) storage batteries; and
(7) other capital investments;
installed to connect charging infrastructure to an electric utility's distribution system, including any necessary upgrades to the electric utility's distribution system.