IC 8-1-46-11: "Performance incentive mechanism"
Where this section sits in the code
- TITLE 8. UTILITIES AND TRANSPORTATION
- ARTICLE 1. UTILITIES GENERALLY
- Chapter 46. Performance Based Ratemaking for Electricity Suppliers
Sec. 11. As used in this chapter, "performance incentive mechanism", or "PIM", means a ratemaking mechanism that is approved by the commission and that:
(1) links an electricity supplier's earnings to the electricity supplier's performance in targeted areas that are consistent with the provision of electric utility service with the attributes set forth in IC 8-1-2-0.6, including:
(A) reliability;
(B) affordability;
(C) resiliency;
(D) stability; and
(E) environmental sustainability;
as described in IC 8-1-2-0.6; and
(2) is based on specific performance metrics against which the electricity supplier's performance is measured.