IC 8-1-8.7-10: Construction of electric generating facilities; additional certification; joint applications

Read at publisher ↗
Where this section sits in the code
  1. TITLE 8. UTILITIES AND TRANSPORTATION
  2. ARTICLE 1. UTILITIES GENERALLY
  3. Chapter 8.7. Clean Coal Technology

Sec. 10. (a) This chapter does not relieve a public utility of the duty to obtain a certificate under IC 8-1-8.5 if the utility is proposing the use of clean coal technology as a part of the construction of an electric generating facility.

(b) A public utility seeking a certificate under IC 8-1-8.5 and this chapter for one (1) project may file a joint application for both certificates. If a joint application is filed, the commission shall jointly consider both certificates.