GroundRules
← Search the law
Kentucky · Snapshot 09/05/2026

KRS 149.342: Timber harvesting operations -- Master logger training and educational

Read at publisher ↗
Where this section sits in the code
  1. KRS Chapter 149

requirements -- Temporary master logger designation.

(1) After two (2) years from July 15, 1998, no person shall conduct timber harvesting

operations within the Commonwealth unless there is on the site during the timber

harvesting operations at least one (1) logger in charge of the harvest who has

successfully completed the Master Logger Program or who has received a

temporary master logger designation in accordance with the cabinet requirements as

provided for in subsection (4) of this section.

(2) After successful completion of the Master Logger Program, continuing education

shall be required of the loggers every three (3) years.

(3) The cabinet shall specify the education and trai ning requirements for the Master

Logger Program as developed by the University of Kentucky, the Kentucky Forest

Industries Association, and the division, shall specify the requirements for

continuing education, and, may establish a basic fee for the progra m that bears a

reasonable relationship to the cost of training.

(4) The cabinet shall specify requirements for a temporary master logger designation,

which shall be valid for four (4) months.

(5) A logger or operator who uses a temporary master logger shal l notify the division

prior to beginning the timber harvesting operation on which a temporary master

logger is on site and in charge.

(6) The division shall maintain a current list of all loggers who have successfully

completed the Master Logger Program and required continuing education, and shall

make the list available to the public. All master loggers shall provide the cabinet

with a published phone number.

(7) Loggers who have previously completed the Kentucky Master Logger Program are

considered to be in compliance with subsection (1) of this section.

(8) Any logger who primarily uses mules or horses in the logging operation shall be

exempt from the Master Logger Program.

(9) After two (2) years from July 15, 1998, all state parks shall have on staff at least one

(1) employee who has completed the Master Logger Program.

Collected 2026-09-05T20:50:42Z. Source file · JSON

Browse this collection