KRS 179.210: Removal of obstructions by contractor or engineer -- Repair of bridges --
Where this section sits in the code
- KRS Chapter 179
Payment of cost.
When a county road is suddenly obstructed or a county bridge becomes unsafe, if it is
under contract for continuous maintenance as provided in KRS 178.140, the county
engineer shall immediately notify the contractor on whose section of road the obstruction
occurs, and within twenty -four (24) hours or as soon as practicable thereafter, such
contractor shall remove the obstruction. If the contractor makes no effort to remove the
obstruction within twenty-four (24) hours, the county engineer shall immediately employ
necessary persons, machinery and teams, and without avoidable delay, cause the
obstruction to be removed from the public road, or the bridge to be made safe. The cost of
removal shall be recoverable from the contractor, as provided in KRS 179.150. But if the
section of obstructed road is not under contract, the county road engineer shall
immediately remove the obstructions in like manner, and the cost ther eof shall be paid by
the fiscal court out of the county road fund.
Collected 2026-09-05T20:51:31Z. Source file · JSON