GroundRules
← Search the law
Kentucky · Snapshot 09/05/2026

KRS 353.130: Alternative methods that may be used when strata shot.

Read at publisher ↗
Where this section sits in the code
  1. KRS Chapter 353

If any of the strata in the well have been shot, creating cavities that cannot readily be

filled in the manner described in KRS 353.120, the well operator shall follow either of the

following methods:

(1) If the stratum that has been shot is the lowest one in the well, there shall be placed,

at the nearest suitable point but not less than twenty (20) feet above the stratum, a

plug of cement or other suitable material that will completely seal the hole; but if

the shooting has been done above one (1) or more oil or gas -bearing strata in the

well, plugging in the manner specified shall be done at the nearest suitable point,

but not less than twenty (20) feet below and above the stratum shot.

(2) When the cavity is in the lowest oil or gas -bearing stratum in th e well, a liner shall

be placed which shall extend from below the stratum to a suitable point, but not less

than twenty (20) feet above the stratum in which the shooting has been done; but if

the shooting has been done above one (1) or more oil or gas -bearing strata in the

well, the liner shall be so placed that it will extend not less than twenty (20) feet

above or less than twenty (20) feet below the stratum in which shooting has been

done. After the liner is placed, it shall be compactly filled with cement, clay or other

nonporous sealing material.

Collected 2026-09-05T20:58:38Z. Source file · JSON

Browse this collection