KRS 353.140: Gas escape pipe, when to be used.
Where this section sits in the code
- KRS Chapter 353
When a well has been filled and securely plugged to a point forty (40) feet below the
lowest workable coal bed, and in the judgment of the well operator, the coal operator and
the department a permanent outlet to the surface is required, the outlet shall b e provided
in the following manner: A plug of cement or other suitable material shall be placed in
the well at a suitable point, not less than ten (10) feet below the lowest workable coal bed.
In this plug and passing through the center of it shall be secu rely fastened an open pipe,
not less than two (2) inches in diameter, which shall extend to the surface. At or above
the surface the pipe shall be provided with a device that will permit the free passage of
gas and prevent obstruction. After the plug and p ipe are set, the hole shall be filled with
cement to a point ten (10) feet above the lowest workable coal bed. If there are additional
overlying workable coal beds, they shall be treated similarly, if in the judgment of the
well operator, the coal operator and the department such treatment is necessary. If the
parties cannot agree, the decision of the department shall control.
Collected 2026-09-05T20:58:38Z. Source file · JSON