KRS 76.340: Classification and report of land affected or benefited by sewer construction
Where this section sits in the code
- KRS Chapter 76
and operation.
If a plan for construction of sewers and/or drains is approved by the county
judge/executive, the commissioners shall then examine the real estate in the sewer
construction district that may be affected or benefited by construction and operation of
such sewers or drains included in such approved plans, and shall classify the land into
such number of classes as the commission deems advisable, and shall report its
classification and the ratio of benefits for each class, from such sewers or drains to be
constructed. This report as to classification shall include a general description of the land
in each class with the names of the owners.
Collected 2026-09-05T20:49:36Z. Source file · JSON