GroundRules
← Search the law
Maryland · Through 2026-01-01

Md. Code, Public Utilities § 7–523

Read at publisher ↗
Where this section sits in the code
  1. Article - Public Utilities

(a) The Commission may require that a deferral of expenses under a rate stabilization plan be either voluntary or mandatory if the Commission finds that the required type of deferral is in the public interest.

(b) The rate stabilization plan may provide that a deferral shall be secured through the issuance of rate stabilization bonds authorized by a qualified rate order under this part.

Collected 2026-09-14T20:00:28Z. Source file · JSON

Browse this collection