GroundRules
← Search the law
Michigan · Snapshot open-us-law v2026.08, retrieved 2026-09-14

Mich. Comp. Laws § 408.1103: Prevailing wage and fringe benefit rates; schedule as part of specifications and bid form.

Read at publisher ↗
Where this section sits in the code
  1. MI Code
  2. Chapter 408
  3. Act Act-10-of-2023

Sec. 3.

A contracting agent, before advertising for bids on a state project, shall have the commissioner determine the prevailing rates of wages and fringe benefits for all classes of construction mechanics called for in the contract. A schedule of these rates shall be made a part of the specifications for the work to be performed and shall be printed on the bidding forms where the work is to be done by contract. If a contract is not awarded or construction undertaken within 90 days of the date of the commissioner's determination of prevailing rates of wages and fringe benefits, the commissioner shall make a redetermination before the contract is awarded.

Collected 2026-09-14T18:32:31Z. Source file · JSON

Browse this collection