Neb. Rev. Stat. § 39-2812: Process; provisions applicable.
Where this section sits in the code
- Chapter 39 - HIGHWAYS AND BRIDGES
(1) The process for selecting a design-builder and entering into a design-build contract shall be in accordance with sections 39-2813 to 39-2816.
(2) Except as otherwise specifically provided in the Transportation Innovation Act, the process for selecting a progressive design-builder and entering into a progressive design-build contract shall be in accordance with sections 39-2813 to 39-2816.
Collected 2026-10-18T05:58:22Z. Source file · JSON