Neb. Rev. Stat. § 39-2812: Neb. Rev. Stat. § 39-2812
Where this section sits in the code
- NE Code
- Chapter 39
(1) The process for selecting a design-builder and entering into a design-build contract shall be in accordance with sections 39-2813 to 39-2816 .
(2) Except as otherwise specifically provided in the Transportation Innovation Act, the process for selecting a progressive design-builder and entering into a progressive design-build contract shall be in accordance with sections 39-2813 to 39-2816 .
Collected 2026-09-14T18:32:21Z. Source file · JSON