Neb. Rev. Stat. § 61-507: Neb. Rev. Stat. § 61-507

Read at publisher ↗
Where this section sits in the code
  1. NE Code
  2. Chapter 61

(1) The process for selecting a design-builder and entering into a design-build contract shall be in accordance with sections 61-508 to 61-511 .

(2) Except as otherwise specifically provided in the Public Water and Natural Resources Project Contracting Act, the process for selecting a progressive design-builder and entering into a progressive design-build contract shall be in accordance with sections 61-508 to 61-511 .