GroundRules
← Search the law
Nevada · Through 2025 session (NRS as revised 2026-08-25) · Newer source version available

NRS 408.319: Report of projects for construction and maintenance: Preparation; contents; revision; public inspection.

Read at publisher ↗
Where this section sits in the code
  1. TITLE 35—HIGHWAYS; ROADS; BRIDGES; PARKS; OUTDOOR RECREATION
  2. CHAPTER 408 - HIGHWAYS, ROADS AND TRANSPORTATION FACILITIES
  3. CONSTRUCTION, IMPROVEMENT AND MAINTENANCE OF HIGHWAYS
  4. General Provisions

1. The Department shall prepare and make available for public inspection a report of its projects for the construction and maintenance of highways. The report must include:

(a) A description of the Department’s work in progress and its proposed projects;

(b) The cost of each project, including the anticipated cost for:

(1) The acquisition of rights-of-way;

(2) Design and engineering; and

(3) Construction; and

(c) The estimated starting dates for each project and the components of each project.

2. The report must be revised every 6 months to indicate any change in the cost of a project or the component of a project, and any change in the starting or completion date of a project.

3. The Department shall make the report available for public inspection at its office during normal business hours.

Collected 2026-09-03T05:51:39Z. Source file · JSON

Browse this collection