GroundRules
← Search the law
New York City · Through Local Law 2026/135 (enacted August 31, 2026) · Newer source version available

N.Y.C. Admin. Code § FGC 610: Section FGC 610: Duct Furnaces

Read at publisher ↗
Where this section sits in the code
  1. New York City Administrative Code
  2. Title 28
  3. Chapter 9: New York City Fuel Gas Code

610.1 General.

Duct furnaces shall be tested in accordance with ANSI Z83.8/CSA 2.6 or UL 795 and shall be installed in accordance with the manufacturer's instructions.

610.2 Access panels.

Ducts connected to duct furnaces shall have removable access panels on both the upstream and downstream sides of the furnace.

610.3 Location of draft hood and controls.

The controls, combustion air inlets and draft hoods for duct furnaces shall be located outside of the ducts. The draft hood shall be located in the same enclosure from which combustion air is taken.

610.4 Circulating air.

Where a duct furnace is installed so that supply ducts convey air to areas outside the space containing the furnace, the return air shall be conveyed by a duct(s) sealed to the furnace casing and terminating outside the space containing the furnace. The duct furnace shall be installed on the positive pressure side of the circulating air blower.

610.5 Unvented duct furnaces.

Unvented duct furnaces are prohibited.

Collected 2026-09-06T02:48:57Z. Source file · JSON

Browse this collection